Victory House, Brighton is an existing prime multi-let office building that was originally developed and constructed in 1994 achieving an EPC Rating of D. The MEP systems at the time utilised conventional centralised air-cooled chillers and gas fired boilers feeding ceiling void mounted four pipe fan coil units with separate supply and extract ventilation systems. Following the recently completed decarbonisation and refurbishment project which included the phased removal of the four pipe fan coil installation and replacement with new heat pump VRF simultaneous heating and cooling systems, exposed heat recovery ventilation, new LED lighting and intelligent lighting controls, the building’s credentials have been greatly improved and now achieves an enviable EPC A Rating.